New contract.

Another contract for the Regionaltangente West in Frankfurt am Main.

15.05.2023 - We have been awarded the planning contract for the Liederbach road bridge!

For the “Regionaltangente West” (RTW), the course of the Liederbach river must be diverted. In the future, the river will pass under Leunastraße at a different location.

This requires the construction of a new road bridge and the demolition of the old bridge. The new structure is directly connected to the Höchst station tunnel structure, for which we have already been commissioned with the planning.

 titel_236_e.jpg