29.09.2016 - After the first topping-out ceremony on 30 April 1966, today saw a second topping-out celebration for this spectacular high-rise structure.
The protected building was completed in 1966 as an innovative suspended construction. The floors of all storeys are suspended from the roof storey which sits on the inner bracing core. The core transmits the entire load of the building into the ground. On the ground floor the inner core is visible as a slender foot.
By April 2017, the building will be completely renovated in the style of the 1960s but to today’s most modern technical standards.