Integration with BIM: Existing trough structure in new quarter.
12.08.2025 - The city continues to develop and we are involved with a new assignment.
As part of the planned urban development of the Elbbrücken city entrance neighbourhood, the infrastructure and building construction between the Oberhafenkanal and Billhorner Kanalstraße are to be comprehensively redesigned.
In this context, there is a need to analyse the existing trough structure of the Billhorner Röhrendamm, which potentially conflicts with the planned construction areas of the new building. The assessment of the impact of the trough on the planned redesign and the identification of necessary adjustments or conversions is to be carried out on the basis of a specially created BIM model for the trough structure.
Our engineering office has been commissioned to carry out the preliminary study and a detailed investigation of the existing trough structure. We are delighted to be able to contribute to the further development of our city in this way.